Measurements are to be made after building main walls, roof and floor decks, if temperature conditions are suitable for work.
Result: dimension plan
Planning of space, furniture and bath fixtures layout
Time-frame: first proposal after two weeks
Result: initial proposal shall include at least three remodeling projects. If none of the proposed projects satisfy the Client, development of remodeling projects will continue until cleared by the Client.
Final result: Layout with furniture and bath fixtures arrangements.
Computer modeling of rooms with photographic accuracy (using real materials, furniture, fixtures lamps, etc.).
Time-frame: within one month
Result: a design option for each room. If the proposed options do not satisfy the Client, the draft design will be respectively altered until cleared by the Client.
Time-frame: within one month
Result:
1) Structural:
2) Design calculation shall be made if the Contractor deems it necessary on completion of Stage II, depending on the planning decision.
3) Electrical
4) Plumbing
5) HVAC
The need to implement sections 3, 4 and 5 of the detailed project shall be discussed with the Client.